Between 1962 and 1963, the facility was modified to handle the additional complexities of the Gemini Program. In 1962, Pan American World Airways Inc. was contracted to design an addition to the facility, which wrapped around the east, north, and most of the west and south sides. This addition included areas for flight control briefing, data analysis, and a large space for a new Gemini spacecraft trainer March 1, 1963